RDSO Compliant Fire Safety

Advanced Fire Protection
For Railway Assets

Specializing in automatic fire suppression, high-sensitivity smoke detection, and emergency response systems for Indian Railway coaches and infrastructure.

100% Fire Safety
RDSO Certified
24/7 Monitoring
Fire Suppression System
Smoke Detector

0%

Fatality Mission Goal

Safety First

Shielding Railways from Fire Hazards

Haruka Infra provides world-class fire safety contracting services. We install and maintain sophisticated Fire Detection and Suppression Systems (FDSS) tailored specifically for the unique environment of railway coaches and stations.

Intelligent Detection

Multi-sensor smoke and heat detectors for early warnings.

Automatic Suppression

Gas-based and water-mist systems to douse fire in seconds.

"Protecting lives and national property through cutting-edge fire engineering."

Haruka Infra Team Fire Safety Division
Our Core Protection

Expert Fire Safety Services

Automatic Suppression

Automatic Suppression

Installation of automatic gas-based suppression systems for engine rooms and electrical panels.

Inquiry Now
Smoke Alarms

Detection Systems

High-sensitivity aspirating smoke detection systems (HSSD) for passenger coaches.

Inquiry Now
Fire Extinguisher

Safety Equipment

Supply, installation, and periodic refilling of all types of certified fire extinguishers.

Inquiry Now
Fire Audit Certified

The Standard of Railway Fire Security

We follow strict NFPA and RDSO guidelines to ensure that every coach we protect is a safe zone for passengers.

1000+

Coaches Protected

Zero

Failure Rate

Compliance Ready

All installations meet the latest railway safety norms.

Expert Safety Auditors

In-house team for fire risk assessment and audits.

AMC Services

Annual Maintenance Contracts for consistent safety.

Our Safety Protocol

Fire Execution Strategy

A systematic 4-step process to fire-proof railway infrastructure.

01

Risk Assessment

Identifying fire-prone zones in coaches and electrical areas.

02

System Design

Strategic placement of sensors, nozzles, and alarm panels.

03

Installation

Rigid integration of suppression systems into the railway asset.

04

Load Testing

Final simulation and drill to ensure system activation readiness.